॥ जय श्री बाला जी ॥ Rohtak, Haryana  ·  tmpservices1980@gmail.com
TMP SERVICES Total Man Power Solutions
Call us 70277 54026

Home › Building Plan Approval

Building Plan Approval in Haryana

Everything else rests on this one. The factory licence file, the fire NOC and the occupation certificate all assume the building was sanctioned and built the way it was sanctioned. When the drawing and the actual structure disagree, every approval after it inherits the problem.

What we handle

Which office applies to you

It depends on where the site sits. Inside municipal limits, in a controlled area, or within an industrial estate. Each has its own submission requirements and its own scrutiny.

Send a file to the wrong office and it does not get forwarded. It just does not move, and you lose weeks finding out.

The problem worth avoiding

The expensive situation is a building that does not match its sanctioned plan. It usually comes out later, when an occupation certificate is applied for or when a factory licence inspection compares the site plan against what is standing.

If your structure has already gone beyond the sanctioned drawing, tell us at the start. It is a manageable problem when you disclose it and a serious one when someone else finds it.

Common questions

Can a building be regularised after construction?

Often yes, depending on how far it deviates and the rules for your location. Tell us at the outset so the approach accounts for it.

Do I need an occupation certificate?

Where it applies to your building, yes. Its absence tends to surface at the least convenient moment.

Last reviewed August 2026. Government procedures, fees and portals change. This page is general information about how these approvals work, not legal advice for your unit. Confirm the current position with the department or call us.

Not sure where your file stands?

One call is usually enough to know where you stand.

Call Now WhatsApp
WhatsApp Us